Our bathrooms (master, kids, and basement) are almost complete. Daniel did an amazing job tiling the showers. We are still waiting on the counter tops and shower doors. Overall, they are looking good. The first picture is the kids' shower. The rest are of the master bath. My favorite part is log insert that was tiled into our floor.
Now that the floors are finished, the final step was to install the permanent stairs and railing. They are not totally complete - Bill is working on the decorative caps - but here is a sneak peek (both upstairs to the loft and downstairs to the basement)
The tongue and groove flooring upstairs took a beating after months of weathering and construction. The crew (i.e., Daniel) however, was able to sand it down to its former beauty. John applied the protective topcoat this past weekend. We are so happy with the end result. Here are pics of the kids' bedrooms and hallway to the loft area.