skip to main |
skip to sidebar
Roof Ready
Even with the loss of Bill, things are moving along. The roof framing is complete with the exception of Emily's dormer. They put the OSB along the back wall of the second floor and have most of the porch posts up. The framing is also done for the specialty windows in the great room. The electrician has also been working hard. The wiring is pulled on the second floor and basement, and outlets are being installed.Looking more like a home every day!
0 comments:
Post a Comment