Friday, December 24, 2010
Winter Wonderland
We have had a very snowy December. Here are some pictures to help you get in the holiday spirit. Merry Christmas everyone!
Floors, Cabinets, and Paint, oh my!
Saturday, November 27, 2010
Basement
Sunday, November 21, 2010
Lots of Progress
I know, it has been a looonng time since the last post, but I have a good excuse. We have been spending just about every free moment working at the ranch. We have accomplished a lot. The exterior is essentially finished. The siding on the upper floor and basement is up and John stained all the eaves (he learned new acrobatic skills in the process). The porch is finally stained, too (whew!). On the interior, we stained all the logs, insulated the whole house, and the drywall is up. It is starting to look complete! There is still a long to-do list, but we are getting closer (yeah!)
Friday, October 15, 2010
New Additions
Lots of new things to see today when I went up to the ranch after work. They finished the siding on the front facade. All it needs now is a little trim around the bottom window.
The garage doors were installed, the replacement window for Em's dormer was put in, and they hung the front entry door.
The HVAC and electrical are finished also, so we should be ready for a framing inspection soon!
The garage doors were installed, the replacement window for Em's dormer was put in, and they hung the front entry door.
The HVAC and electrical are finished also, so we should be ready for a framing inspection soon!
Sunday, October 10, 2010
Finishing the Front
Thursday, October 7, 2010
Wednesday, October 6, 2010
Windows and Roof
The roof is almost entirely shingled. We have also stained the entire exterior and most of the log siding that will finish off the second floor.
Wednesday, September 29, 2010
More Green
The color continues to appear at the ranch. The shingles are about 50% complete and should be finished when Rob returns from a short vacation. Because Rob was away, Bill made a grand return and facilitated getting the windows put in. He also finished up our railing and outdoor stairs. It was great seeing him back on site.
The weekend crew (Pop, John, and me) started the staining process. Here are the false corners completely finished (1 coat primer, 2 coats stain, 2 top coats). I think they turned out great. I like the color, especially with the green windows and shingles.
The weekend crew (Pop, John, and me) started the staining process. Here are the false corners completely finished (1 coat primer, 2 coats stain, 2 top coats). I think they turned out great. I like the color, especially with the green windows and shingles.
Wednesday, September 15, 2010
Seeing Green
Emily's window seat has been framed. I think it is a fun feature. It is also a very large space, as you can see by the picture with John standing on it.
I joined the crew and helped finish studding up the basement this weekend. We finished with no boards cut too short. I was very proud!
Friday, September 10, 2010
Bring on the Shingles
We are finally ready for shingles! Preparing the roof was a long process because of the many layers - 2 sheets of insulation, followed by OSB, and topped with tar paper. There is a picture below of a cross section that shows that. Plus, the dormer had to be framed. I am excited to see that last piece go up on the house. It gives the front a more balanced look and there is lots of room on the inside of the dormer (see the second picture).
The rough-in plumbing is finished and has passed inspection. The fourth picture is the plumbing work for the basement (that is John and Pop's handy framework). The electrician is just about finished up with the electrical boxes,and now the HVAC sub is on the scene. The vents have been cut and duct work started.
My favorite new addition is the porch railing. Bill has been hand making it at home, since he is no longer working on site, and a few sections were completed today. Now I just need my rocker :)
The rough-in plumbing is finished and has passed inspection. The fourth picture is the plumbing work for the basement (that is John and Pop's handy framework). The electrician is just about finished up with the electrical boxes,and now the HVAC sub is on the scene. The vents have been cut and duct work started.
My favorite new addition is the porch railing. Bill has been hand making it at home, since he is no longer working on site, and a few sections were completed today. Now I just need my rocker :)